North London – New Housing Development

A leak has occurred in a newly built block of flats which was due to be handed over in 14 days. Our surveyor has inspected the site and carried out full moisture survey which allowed us to provide our client with a moisture map showing how far has the water spread as well as choosing the right drying method for this type of construction, most of the ground floor has been affected which resulted in mould growth.
Rushax collaborates with the Navig8 Restoration team, providing support in web design and digital marketing.
All author posts